31. In a steam power plant, ________ heats the feed water on its way to the boiler by delivering heat from the flue gases
- Superheater
- Economiser
- Preheater
- Turbine
32. ________ are employed for the operation of jaw crushers.
- DC shunt-wound motor
- Squirrel cage induction motor
- Belted slip ring induction motor
- Any DC motor
33. The biggest unit size of the steam plant in India is [as of Nov 2016]
- 250 MW
- 100 MW
- 1000 MW
- 500 MW
34. The optimal scheduling problem in case of a thermal plant can be completely solved at any desired instant _______
Case-A: with reference to the operation at other times.
Case-B: without reference to operation at other times.
- Case-A
- Case-B
- Case-A or Case-B
- None of these
35. The size of the venturimeter is expressed as 200 x 100 mm2. It means that the
- diameter of the upstream pipe is 200 mm and that of the downstream pipe is 100 mm.
- diameter of the pipe is 200 mm and that of throat is 100 mm.
- diameter of the pipe is 100 mm and that of throat is 200 mm.
- None of these
36. Which of these sources leave a larger carbon footprint?
- hydro
- solar
- thermal
- hydrogen
37. Power generation of thermal power plant is based on
- rankine cycle
- otto cycle
- diesel cycle
- carnot cycle